pin type silicone rubber composite insulator for the urban net rebuild can effectively solve the shortage of corridor in urban power line, reduce the pole height, economy lots of financial and material resources. The advantage of the composite insulator are high strength, which can avoid the porcelain cross-arm causes to concatenate breakage of high strength accident, and fine anti-pollution.
Description
Name: polymer pin insulator
Type: Polymer pin insulator
Related type: 12kV,24kV,33kV polymer pin insulator
Voltage Range: 12kV~250kV
Standard: The IEC standard
Colors of insulators: Red or light gray
Mechanical failing load: 45kN,70kN,90kN,120kN and as per client's request
Material: Silicone Rubber Housing & Fiberglass rod and end fittings
Application: Overhead lines and transmission lines
Parameter (IEC 61952, IEC 61109)
Type |
Rated voltage(kV) |
Rated mechanical tension load(kN) |
Structure Hight(mm) |
Min.Electric arc distance(mm) |
Min nominal creepage distance(mm) |
Full wave lightning impulse withstand voltage(peak value)not less than(kV) |
1 min power frequency wet withstand voltage not less than(kV) |
FSW-10/3 |
10 |
3 |
290 |
165 |
380 |
165 |
45 |
Our products have being in service on electrical networks of more than more than 20 countries from 2005.
We had supplied our products and services to the below customers:
CHINESE STATE GRID,KENYA KPLC & REA,UGANDA REA & UMEME,TANZANIA TANESCO,GHANA ECG,SOUTH AFRICA ESKOM & ARB,NIGERIAL NEPA,COTE D'IVOIRE CI-ENERGIES,JORDAN EDCO & NEPCO,OMAN PDO,VIETNAM EVN,MEXICO IUSA,ECUADOR CELEC,NEPAL NEA,
......….
Here, We look forward to your joining.
Our factory had obtained ISO9001, ISO14001, OHSAS 18001, and almost of our products had been tested by CNAS certificated Laboratory, for example KEMA, Chinese National Lab, and etc
What can we do for you?
1) Good quality guarantee (2 years).
2) Competitive Price (Factory direct price).
3) Agent service in all the world.
4) On time delivery.
5) We offer sample for free.
6) Professional Technology .
7) Quality Control through the whole Manufacturing process.
a. Check the material before the production .
b. Have the random inspection during the production .
c. Make the 100% inspection before the shipment